Skip to main content

Progress tracker

Track roads, dams, clinics and schools as they are built, with dated progress and before-and-after photographs.

Aerial view of the multi-level Trabablas interchange in Harare.
Roads and bridgesUnder way

Emergency Road Rehabilitation Programme 2 (ERRP 2)

A national road rehabilitation programme covering routes including the Harare–Beitbridge road and the Mbudzi interchange, prioritising local contractors.

0% complete

ZANU-PF published projects, zanupf.org.zw · as at 1 August 2026

A rehabilitated dual-lane section of the Beitbridge–Harare–Chirundu highway, with a haulage truck travelling north.
Roads and bridgesUnder way

Beitbridge–Harare–Chirundu Highway

Rehabilitation of 580km of the North–South Corridor, built using five local companies.

0% complete

ZANU-PF published projects, zanupf.org.zw · as at 1 August 2026

That is everything